Like said in my previous post, this week I intended to have my second photoshoot, which was supposed to be of the school nurse. This has been swopped around due to the fact I couldn't have the first photoshoot until this week of my friends. This does mean I am still on task, as when I checked my schedule I realised I wasn't even meant to start editing the items until next week and I have actually completed the leaflet, so I do actually have a week extra to spend on my products or contigency if needed. So I haven't actually been meeting the plan in the sense that my photoshoots are backwards and I am a week ahead, but this isn't a bad thing and doesn't affect the plan really as I am ahead which is great. Today I am doing my second and final photoshoot, with my friends as models for students. Once this has been completed, after checking through the photos, I can start work on the poster. Tonight I will go through the photos, deleting the ones I won't use and creating a photoshoot log. Tomorow I will start creating the poster, working solely on the poster this week, hopefully finishing by Friday, if not by Monday. Last week, I managed to do my photoshoot on the Tuesday, sort through the photos on Wedensday creating my photoshoot log of the photos, and spending the thursday to sunday creating my leaflet, so I feel this was a successful week and got everything completed I hoped to complete.
So far everything has gone really smoothly. My first photoshoot went great and got done really quickly, as did the creation of the leaflet which only took me 4 days to produce. I now have one of my products out the way which is great, and hopefully I can go back to it later to edit anything I want to perfect last minute. I haven't had to use any contigency planning as of yet, and If I do I have a week to take into account as I wasn't even expected to start creating anything until next week, and now I have one completed.
My previous posts contain my finished leaflet , so I don't need to show that again. The leaflet is definately the most simple of the four products, as all it took was some text with effects such as a stroke and drop shadow, an image of a key in the middle which was done by taking an image of a key and adding gradients to it to get rid of any marks on the key, and also adding text with effects such as bevel and emboss. In the inside of the leaflet a bit of writing was needed but all this will be explained more in depth in the magazine therefore I didn't want to write too much in here. I wrote the text on the inside of the leaflet in a day, and also on the inside of the leaflet was an image of the school nurse. This had beene edited to remove the marks on the table she was leaning against, and also used selective colour in photoshop to change the colors of the image a little.
I hope that the client would be happy with my progress so far, I am definately on track and at the moment have no issues with what I have done so far or that I will have any issues to come , unless something went wrong with my photoshoot today I will be on track to create the next three items in my product. So as lonh as today goes well I know I will have no issues over the next few weeks to create my products.
No comments:
Post a Comment